Telecom towers and radar stations share a physical profile: they have to stand high, they have to be cabled up, and most of the time nobody is on site. Those three facts together turn "being struck" from a probability into an operating cost — one strike can take out the radio unit, the transmission equipment and the power modules at the same time, and the repair waits for a vehicle, a technician and a spare part.

Where the surge actually enters

A direct strike is only one path, and usually not the largest share of failures. Three others cause most of the trouble:

  • Along the feeder. Coaxial feeder runs from the antenna at the top all the way to the cabinet; when the tower is struck, induced voltage on that line arrives directly at the radio port.
  • Along power and signal cables. Mains, generator, optical transmission and CCTV cabling are all entry points; remote hilltop sites often add a long span of overhead line.
  • Earth potential rise. Near a strike point the local earth potential rises briefly, and the difference between separate earth systems damages equipment through its earth terminal.

On the standards side, telecom sites generally follow IEC 62305 together with guidance such as ITU-T K.56 on protection of radio base stations against lightning. Tower, equipment room and cabling have to be designed as one system — the tower top alone is not a design.

What a conventional air terminal costs here

Fitting an air terminal at the tower top is the common answer: it ensures the strike lands there and the current is drained through the structure and down conductors. That works in many settings, but on towers and radar sites it runs into two practical problems. First, as strike current flows down the structure and the feeder, the equipment in the cabinet absorbs the induced overvoltage that comes with it. Second, unattended sites have long fault-finding and repair cycles, so a "struck but not burned down" event usually ends with several boards and radio modules replaced.

In other words, the loss on these sites does not come from current being routed badly — it comes from the strike happening at all.

How a suppression layout is planned

Excluding the strike from the protected volume is the alternative. The device sits at the highest point — tower top or a dedicated spar — with a protection radius covering the structure, sector antennas, microwave dishes and the roof of the equipment room. Three things are checked when laying it out, following the logic of Figure 1: whether the device stands above everything it protects, whether the horizontal reach covers the equipment room and the feeder entry, and whether taller neighbouring structures cut into the volume.

Protection radius coverage diagram: a CMCE device at the highest point covers the tower, antennas and equipment below
图 1 标称保护半径 R 覆盖塔体、天线与机房顶:竖直方向覆盖与水平延伸需同时核算,周边更高结构会在保护体积内形成遮挡

Dense urban sites frequently host several operators on one tower; there the device position has to be coordinated with existing antennas and microwave dishes to avoid shadowing. At isolated hilltop sites the equipment room and generator shed drive the layout, and coverage usually has to be extended toward the room. For a single tower, a 55 m or 120 m radius model normally suffices, depending on tower height and the distance to the equipment room.

Suppression outside, voltage limiting inside

Suppression answers whether the strike happens, but overvoltage on feeders and power lines does not come only from direct strikes — nearby strikes, static and switching all generate surges. Both measures belong in one design, as Figure 2 shows:

Base station protection and earthing path diagram: device at tower top, feeder route to equipment cabinet, bonding bar, SPDs, ring earth electrode and earth rods
图 2 外部抑制与内部限压的分工:设备抑制雷击形成,SPD 限制沿馈线、电源与信号线侵入的过电压,塔基与机柜统一接入环形接地网
  • Feeder ports. Fit coaxial SPDs at the antenna feed and again at the cabinet entry, matching insertion loss in the operating band and the required discharge capacity.
  • Power ports. Apply coordinated protection: a first stage at the main incoming distribution, a second stage at the cabinet distribution.
  • Signal and data ports. Select SPDs by interface type for optical transmission, monitoring and timing circuits.
  • Bonding. Provide an equipotential bar inside the cabinet, collecting SPD earth terminals, equipment casings and cable screens before a single connection to the earth grid — otherwise every SPD "has its own earth" and the coordination is lost.

Earthing and bonding are the foundation

Telecom sites normally use a ring earth electrode with vertical rods, shared by the equipment room, tower, generator and optical cable closure. Three points deserve attention: the tower base and the equipment room earth must be one system, because a large share of faults trace back to two independent earths that develop a potential difference during a strike; metallic strength members and screens in optical cable must be terminated as the code requires, not left floating; and any equipment added during upgrades must be re-connected to the bonding bar — the item most often missed in service.

Measurement practice and acceptance data are covered in the earthing and bonding note.

Monitoring an unattended site

The dominant cost at an unattended site is not knowing what happened. A Storm 7 monitoring system at the tower top records field activity and events in the protected area; together with annual earth-resistance measurements it gives a traceable record, so a failure can be attributed to a strike, degraded earthing or a power problem.

What is different about radar stations

Radomes and waveguides add concerns. A radome is usually composite and provides no shielding; waveguides and feeders are longer, raising port overvoltage risk; and the site often sits on an isolated high point with no taller structure to share the exposure. Layout normally places the device at the radome top or on a mast, and treats the waveguide entry and the equipment cabinet as critical protected ports. Coverage should be verified point by point against the site outline drawing.

Ask for a site layout

Send tower height, antenna and microwave mounting heights and azimuths, the equipment room position and the existing earth grid. We will return device positions and model recommendations based on protection radius, with a supporting earthing and SPD list. Submit your requirement here, or write to sales@malinsmarine.com.