Lightning protection is usually split into an upper and a lower half: the upper half is the air terminal or the suppression device, the lower half is earthing and bonding. The upper half decides whether a strike happens; the lower half decides whether the charge can actually be taken away. In real projects it is the lower half that causes trouble — a beautifully installed device sitting on a single angle-iron driven into backfill.

What earth resistance should actually be

The common acceptance figure is 10 Ω at power frequency. Petrochemical, telecom and data centre projects often specify 5 Ω or even 4 Ω. Marine work is different: the requirement is a milliohm-level connection between protective conductors and the hull, not tens of ohms. The logic behind all of them is the same — the lower the earthing impedance, the smaller the earth potential rise during a discharge, and the smaller the potential difference equipment and people are exposed to.

Worth stating plainly: 10 Ω is a customary floor, not a pass mark. On sites with a suppression device, the continuity of the earthing system and the quality of bonding usually matter more than the resistance reading at a single test point.

When soil resistivity is poor

Earth resistance is governed by soil resistivity and electrode geometry. In gravel, rock or frozen ground, deepening a single vertical rod yields little. The measures that actually work, in order of effectiveness:

  • Increase the earth grid area. Horizontal conductors lower overall resistance more readily than one deep well, and shorten the discharge path.
  • Soil replacement or resistance-reducing agents. Backfill around electrodes with low-resistivity material, choosing products with long-term stability and no soil contamination.
  • Multiple electrodes in parallel. Keep spacing at roughly 1.5 to 2 times the electrode length so the electrodes do not shield each other.
  • Grounding modules and ionic electrodes. Useful where space is tight, but calculate equivalent resistance from the manufacturer's data instead of relying on marketing figures.

What must be bonded

Bonding exists to remove potential differences between metallic parts, because during a strike it is the difference — not the absolute potential — that destroys equipment and injures people. The scope normally covers:

  • The device itself, its mounting spar, and the metallic structure being protected: masts, tank shells, towers, curtain-wall framing.
  • Metal piping, cable trays, metal roofing and gutters.
  • Distribution board enclosures, telecom and instrument cabinets, and cable screens entering the building.
  • On vessels: superstructure, steering gear, antenna bases and the casings of navigation equipment.

Conductor cross-sections follow the expected strike current, and every joint needs corrosion protection. A bolt tightened "well enough" is not a bond: an oxidised joint can present orders of magnitude more impedance under impulse current.

Sea earthing on vessels

With a steel hull, the hull itself is the earth electrode and the task is a low-resistance connection between protective conductors and hull. GRP and composite hulls have no natural earth, so dedicated measures are needed:

  • Sea earth plate. Copper or sintered metal plate on the hull bottom, sized to the vessel, with sealed and corrosion-protected penetrations.
  • Dynamic earthing. A towed electrode used while under way, appropriate where earth potential must be tightly controlled, at the cost of handling and maintenance.
  • Equipotential bus. An internal earth bus collecting mast, superstructure, navigation equipment and the distribution system, then connecting to the sea earth.

Read this together with marine system selection: once the device positions are fixed, the earthing route can be designed.

What to measure at acceptance

Acceptance is not "clamp the tester on and write down a number". Three data sets are normally required:

  • Earth resistance, by the three-pole fall-of-potential method, with test points far enough from the grid that the auxiliary electrodes do not sit in the same potential zone.
  • Bonding resistance at joints, using a micro-ohmmeter or high-current method, sampling the critical metallic connections.
  • Continuity of the whole path from device to electrode, checked section by section — especially concealed work and anything altered by later construction.

File these with the layout drawing and protection-radius calculation. For petrochemical, class society and third-party acceptance, a missing item means rework.

Three things overlooked in service

First, electrode corrosion: copper-clad steel and galvanised angle iron age very differently in wet soil, so dig and inspect once every five to ten years. Second, bonding broken by new equipment: cabinets, piping and monitoring gear added later are often left unconnected to the earth bus. Third, loose joints: under vibration — vessels, turbines, vehicle-mounted systems — a loosened bolt takes the whole path out of service.

Where continuous evidence is needed, a Storm 7 monitoring system at key points records field activity and events in the protected area, and together with periodic earthing measurements forms a complete operating record.

Ask for an earthing review

Send soil conditions, available earth-grid area, the equipment list to be protected and the code you work to. We will return earthing and layout recommendations matched to the land range or the marine range. Submit your requirement here, or write to sales@malinsmarine.com.